Agenda Item Details: Accept Construction Bid Package #5 (Franklin Elementary combined plumbing and HVAC)
Parts / Attachments (2): Open in New Window
Motion to be considered:
To accept bid package #5 (Franklin Elementary combined plumbing and HVAC) work category 7 and 8 from River City Mechanical Contractors, Inc. for a total of $1,407,024.
Rationale:
After review it was determined by our design team that River City Mechanical was the responsive low bidder and met the basis of design set forth by Strickland Engineering. It was also noted that the energy savings offered by the Daikin system would not provide the return on investment needed to offset the difference. Therefore it is the administrations recommendation to move forward with the responsive low bidder (RCM).
To accept bid package #5 (Franklin Elementary combined plumbing and HVAC) work category 7 and 8 from River City Mechanical Contractors, Inc. for a total of $1,407,024.
Rationale:
After review it was determined by our design team that River City Mechanical was the responsive low bidder and met the basis of design set forth by Strickland Engineering. It was also noted that the energy savings offered by the Daikin system would not provide the return on investment needed to offset the difference. Therefore it is the administrations recommendation to move forward with the responsive low bidder (RCM).